SOCIALIZUS PROJECT IS A NEW SOCIAL NETWORK FOR SOCIALISING AND PARTYING WITH YOUR COMMUNITIES
Home » Activités

Activités

  • dflongcheng a publié une note il y a 5 ans et 6 mois

    Function:
    automatically rolling, kneading, grinding tea leaves.
    Product Informations
    Air pressure- type tea roller , automatic force pressure of tea, highly reduce the wearing and tearing of tea leaf.
    Realize tea leaf more solid and strong, automatic control rolling time. adopt stainless steel material of tea leaf contacting parts. 40~200kg withered leaf /time. one hour could process 180~200kg leaf.
    Product Parameters
    Modeloutside dimensions
    (L X W x h)Inner diameter of
    the kneading drumMotorProductivity
    (kg/ cycle)Pressuring device
    YX-6CRT-45PT1280 x 1220 x 1350mm450mm1.1kw/380v15-25kgFloating pressuring by
    single column screw
    YX-6CRT-55QT1560 x 1430 x 1660mm550mm2.2kw/380v40-50kgIntelligent gas
    pressurization
    YX-6CRT-65QT1740 x 1610 x 1580 mm650mm3kw/380v90-100kgIntelligent gas
    pressurization
    YX-6CRT-75QT2050 x 1900 x 2400mm750mm5kw/380v100-200kgIntelligent gas
    pressurization
    Application
    Big tea factory process tea leaves, automatically rolling tea leaves, process tea leaves better.
    About Packing and Delivery
    We will pack the goods as the exported requirement and make the fast delivery. To confirm that you will get the good goods. We usually suggest our customers do the shipment by sea because It is economical, the air transport is short time but expensive. The forwarder can be provided from you then we will help to contact them, and you also can use our cooperation forwarder.
    Transport, installation and commissioning
    1.When transporting, it is required to place a smooth, fixed and no relative sliding to prevent the impact from damaging the machine.
    2. Installation & commissioning
    Tea rolling machine installation is simple, in the selected position, will be installed in the tea rolling machine bracket suspended (pre-dug The pouring hole), three feet to the positive three pouring holes, put on the screw ,then correct rubbing plate level, and then poured cement mortar, when the cement mortar is strong, remove the support, and then gradually tighten the foot nut, can also be used M12 expansion bolts fixed, and at any time on the edge of the rubbing plate with a horizontal meter to measure the positive level, until the nut tightening, the installation is complete.
    Preparation before use:
    a) Remove the debris and tools left over from the rubbing plate, rolling bucket and machine;
    b) Be sure to check that the supply voltage used is the same as the motor voltage of this product, and connect the ground line and electric shock protector to ensure the safety of the person and machine;
    c) Carefully check whether the fastener is reliable, especially if the fastening screws on the curvature arm are loose and shedding.
    d) Check the amount of mechanical oil in the gearbox, if not enough, please add a number of mechanical oil to the box.
    e) Outside the warning area, the empty car commissioning for 10 minutes, to observe whether the direction of operation is correct, gear rotation is normal, if there is blocking, collision phenomenon should be immediately shut down to check.
    EASY OPERATION AND MANTENANCE ONE STOP FACTORY SERVICES Tea Rolling Machine price
    website:http://www.kuntok.com/tea-rolling-machine/

Installé par Sitedigital.fr